Tuesday, September 9, 2014

It’s All in the Prep



Last Friday night seems like a week ago already; so much has happened since then. I’ll put off my write-up on yesterday’s track event for a second blog post.

Friday evening I had some driveway time available to me, so I took on the task of giving Glinda a tune-up. I’d sprung for the good stuff when I placed my order with Clark’s so I was optimistic that, once done, she’d run smoothly up into the higher revs. The job went surprisingly well. I got the new points and condenser installed without dropping any of the tiny screws – TYL. I got the plugs changed without stripping out any threads - TYL. I got the rotor and cap changed without crossing any wires. With all the new parts in, I adjusted the point gap to an indicated 34 degrees on the dwell-meter and the distributor twisted to an indicated 12 degrees BTDC (before top dead center) on the timing mark. With that done, I cut down and installed the two-and-a-quarter inch tailpipe I’d recently bought. This would ensure that the hot exhaust gasses would exit aft of the car’s body. While I was fitting the pipe, I discovered the bracket I’d clamped to had broken, so I needed to re-clamp – this time grabbing more metal under the clamp.

Saturday, the lovely Loriann posited, “Wider tires means a safer car, right. Well, put the longer studs on.” With that encouragement I dove into the stud replacement project. Starting at Glinda’s right front, I jacked up the right side of the car, supported it on a jackstand, removed the front wheel, followed by the drum, and finally the hub. With a lugnut in place over the end of each stud, I whacked them all out with a hammer and then, using a washer-backed lugnut and my ½ inch impact wrench I pulled each new stud until the knurl was fully seated in the hole. The other front hub went the same way, while the rears had to be done with the hubs still in place.

Once all the studs were in place and the hubs and drums reinstalled, I mounted the IROC wheels and lowered the car back onto the driveway. With some driveway-time still available, I proceeded to install the new throttle linkage kit I bought with THRaF money. It was more of a challenge than I’d anticipated and the end of driveway-time came before it was completely installed. I set the alarm clock for early Sunday morning, and finished the job before the lovely Loriann left the bed.

It took another hour or so that evening to pack parts and supplies in the back of the truck, drive Glinda to the gas station to put fuel in her tank as well as fill two five gallon jugs with hi-test, and, finally, hitch her up to the truck.

No comments:

Post a Comment